السعر: 211 دينار كويتي

    تفاصيل الدورة

    Understand various types of construction Delay Analysis Techniques and Methodologies used in Construction Claims and Dispute Resolution. Course is designed  to help attendees to learn the theoretical  basis of each Delay Analysis Technique along with the application of these Techniques through real Projects where Trainees will be  working by hands on Primavera models step by step.
    • The Need for Delay Analysis
    • Contracts and Delay Analaysis
    • Window Analysis Method 
    • Delay Analysis Methodologies
    • Collapsed As Built Method
    • Law Principles
    • Introduction to the Construction Law
    • Planning and Scheduling in Delay Analysis
    • Contracts and Delay Analaysis
    • Impacted As Planned Method
    • Standards and Protocols
    • Time Impact Analysis (TIA) method
     
      تحديث بتاريخ 23 January, 2018

    المتطلبات

    Attendees in this course are required to bring their Laptops with Primavera 6 installed.
     

    دورات يمكنك الالتحاق بها على الفور... خذ دورة عبر الإنترنت على Construction ابتداءً من الآن. See all courses

    هل هذه الدورة التدريبية الاختيار المناسب لك؟

    لم تجد ما كنت تبحث عنه؟

    أو