- الموقع: قرية المعرفة - دبي
- مدة الدورة التدريبية: 4 To 24 Hours
- مواعيد الدورة: Part Time, Weekends
تفاصيل الدورة
Understand various types of construction Delay Analysis Techniques and Methodologies used in Construction Claims and Dispute Resolution. Course is designed to help attendees to learn the theoretical basis of each Delay Analysis Technique along with the application of these Techniques through real Projects where Trainees will be working by hands on Primavera models step by step.- The Need for Delay Analysis
- Contracts and Delay Analaysis
- Window Analysis Method
- Delay Analysis Methodologies
- Collapsed As Built Method
- Law Principles
- Introduction to the Construction Law
- Planning and Scheduling in Delay Analysis
- Contracts and Delay Analaysis
- Impacted As Planned Method
- Standards and Protocols
- Time Impact Analysis (TIA) method
تحديث بتاريخ 23 January, 2018
المتطلبات
Attendees in this course are required to bring their Laptops with Primavera 6 installed.
وظائف مناسبة لهذه الدورة
Project Manager , Planning Manager , Projects Control Manager , Construction Managerالموقع
Construction أسئلة ذات صلة
- Asbestos Awareness Training Express39 درهم
808 درهممدة الدورة التدريبية: 4.5 Hours - Land and building survey Course Line94 درهم
1,469 درهممدة الدورة التدريبية: Upto 10 Years
