PRIMAVERA P6 Vedant Trainings
Price: AED 2,100
Instructor led live virtual classroom online. Classes may be individual or in group.
  • Duration: 2 days
  • Timings: Weekends

    Course details

    Introduction to Primavera

    • Describe Primavera solutions
    • Describe P6

    The Project Management Life Cycle

    • Review the relationship between Primavera and the Project Management Life Cycle
    • Identify the five process groups in the Project Management Life Cycle

    Data, Navigating, and Layouts Describe enterprise and project-specific data

    • Log in
    • Open an existing project
    • Navigate in the Home window and Activities window
    • Open an existing layout
    • Customize a layout
    • Save a layout Enterprise Project Structure
    • Describe the components that comprise the Enterprise Project Structure
    • View the EPS

    Creating a Project

    • Create a project
    • Navigate in the Projects window
    • View and modify information in Project Details

    Creating a Work Breakdown Structure

    • Define a Work Breakdown Structure
    • Create multiple levels of a WBS hierarchy Adding Activities

    Describe an activity and its components

    • Describe activity types
    • Add activities
    • Add a Notebook topic to an activity
    • Add steps to an activity
    • Assign activity codes to activities

    Creating Relationships

    • View a network logic diagram
    • Differentiate between the four relationship types
    • Create relationships in the Activity Network
    • Create relationships in Activity Details

    Scheduling

    • Perform a forward and backward pass
    • Describe float and its impact on a schedule
    • Identify loops and open ends
    • Calculate a schedule
    • Analyze the scheduling log report

    Assigning Constraints

    • Apply an overall deadline to a project
    • Apply a constraint to an individual activity
    • Add notebook topics to constrained activities
    • Describe the available constraint types

    Maintaining the Project Documents Library

    • Describe the difference between a work product and a reference document to a specific criteria
    • Create a document record
    • Link the document record to a project document or work product
    • Assign the project document to an activity or WBS

    Formatting Schedule Data

    • Group activities according to a specific criteria
    • Sort activities
    • Apply a filter
    • Create a filter

    Roles and Resources

    • Describe roles
    • Views the roles dictionary
    • Describe resources
    • Identify the differences between labor, nonlabor and material resources
    • View the resource dictionary

    Assigning Roles

    • Assign roles to an activity
    • Assign rates on roles

    Assigning Resources and Costs

    • Assign resources by role
    • Assign labor, non-labor, and material resources to activities
    • Adjust Budgeted Units/Time for a resource
    • Assign expenses to activities

    Analyzing Resources

    • Display the Resource Usage Profile
    • Format a profile
    • Format the timescale

    Optimizing the Project Plan

    • Analyze schedule dates
    • Shorten a project schedule
    • Analyze resource availability
    • Remove resource over allocation
    • Analyze project costs

    Baselining the Project Plan

    • Create a baseline plan
    • Display baseline bars on the Gantt Chart
    • Modify the bars on the Gantt Chart

    Project Execution and Control

    • Describe several methods for updating the project schedule
    • Use Progress Spotlight
    • Status activities
    • Reschedule the project

    Reporting Performance

    • Describe reporting methods
    • Run a schedule report
    • Create a resource report with the Report wizard
    • Create a report using the current layout

    Updated on 06 December, 2017
    Courses you can instantly connect with... Do an online course on Primavera starting now. See all courses

    Is this the right course for you?

    Didn't find what you were looking for ?

    or