Primavera Training
السعر: 13,000 INR
  • الموقع: Nagpur
  • مدة الدورة التدريبية: 40 ساعة
  • تاريخ البدء: استفسر

تفاصيل الدورة

PROJECT PLANNING AND MANAGAMENT Primavera P6 V7 Total Duration : 30 Hours Student Name
DAY 1,2  Introduction to CADD Mastre , PPM Concepts , CPM/PERT/PDM ,  Organizational Breakdown Structure (OBS), Different Views,  To create new OBS,  Enterprise Project Structure (EPS) , Different views.,  To Create new EPS  Assigning the responsible manager  Difference between EPS & OBS
DAY 3
 Projects , Overview of the Project  Creation of new project through wizard  Creation of new project through details  Calendar Global, Resource, Project., New Calendar  Making a Project or resource Calendar as global.  Assigning a Calendar as default for the projects.
DAY 4,5
 Work Breakdown Structure (WBS), Example for WBS  Defining Structure , Applying WBS for tasks  Entering Activities through Wizard and Details.  Mile Stones, Activity Type, Inserting a new Column  Moving the Columns, Time Scale adjustments.  Different kind of relationship between tasks.  Different methods of linking  Estimating the project finish date.  Identifying the project critical path  Applying different calendars to activities & Estimating the finish date.
DAY 6,7
 Activity Codes, Code Definition, Assigning Code.  Project Codes, Code Definition, Assigning Code ,  Resource Codes, Code Definition, Assigning Code ,  Reorganizing Constraints in a Project.  Types of Constraints, Use of Secondary Constraint
DAY 8
 Work Products & Documents  Defining WPs & Docs, Assigning it for activities.  Currency  To change the currency  To Create new Currency  Setting exchange rate
DAY9
 Roles, Importance of Roles ,Defining the roles  Giving rates for the roles  Resource Sheet Preparation  Defining Resource through Wizard  Defining Resource through detail  Defining Resource through Calendar  To create new unit of Measure for materials which is not available in the list.  Resource Assigning DAY 10
 Analysis Resources  Resource Usage Profile  Resource Usage Spread Sheet  Resource Curves  Resource Leveling  Concepts of Stretching, Crunching & Splitting - Manual  Automatic Leveling
DAY 11
 Setting Database  Updating Progress  Entering Actual Start & Actual Finish date for tasks  Updating through duration  Updating through Physical  Cost Updating  Comparative Study of Baseline and Actual Plan  Reflecton
DAY 12,13
 Calculating earned Value analysis  Filter ,Threshould,Issue,Risk  Reports  Tabular , Graphical  Import / Export  Formatting Bars
DAY 14
 Methodology Management
DAY 15
 PROJECT WORK تحديث بتاريخ 09 October, 2017

المتطلبات

Mechanicle  engineers,
civil engineer,
electricle engineer,
electronics engineer,
any graduate who like to work under project,

 

وظائف مناسبة لهذه الدورة

Project engineer , project planner , planning engineer , Project Manager

استفسر عن هذه الدورة

يمكنك إضافة المزيد من الدورات التدريبية هنا.
سيتم حفظ القائمة.