تفاصيل الدورة
Introduction to Primavera
- Describe Primavera solutions
- Describe P6
The Project Management Life Cycle
- Review the relationship between Primavera and the Project Management Life Cycle
- Identify the five process groups in the Project Management Life Cycle
Data, Navigating, and Layouts Describe enterprise and project-specific data
- Log in
- Open an existing project
- Navigate in the Home window and Activities window
- Open an existing layout
- Customize a layout
- Save a layout Enterprise Project Structure
- Describe the components that comprise the Enterprise Project Structure
- View the EPS
Creating a Project
- Create a project
- Navigate in the Projects window
- View and modify information in Project Details
Creating a Work Breakdown Structure
- Define a Work Breakdown Structure
- Create multiple levels of a WBS hierarchy Adding Activities
Describe an activity and its components
- Describe activity types
- Add activities
- Add a Notebook topic to an activity
- Add steps to an activity
- Assign activity codes to activities
Creating Relationships
- View a network logic diagram
- Differentiate between the four relationship types
- Create relationships in the Activity Network
- Create relationships in Activity Details
Scheduling
- Perform a forward and backward pass
- Describe float and its impact on a schedule
- Identify loops and open ends
- Calculate a schedule
- Analyze the scheduling log report
Assigning Constraints
- Apply an overall deadline to a project
- Apply a constraint to an individual activity
- Add notebook topics to constrained activities
- Describe the available constraint types
Maintaining the Project Documents Library
- Describe the difference between a work product and a reference document to a specific criteria
- Create a document record
- Link the document record to a project document or work product
- Assign the project document to an activity or WBS
Formatting Schedule Data
- Group activities according to a specific criteria
- Sort activities
- Apply a filter
- Create a filter
Roles and Resources
- Describe roles
- Views the roles dictionary
- Describe resources
- Identify the differences between labor, nonlabor and material resources
- View the resource dictionary
Assigning Roles
- Assign roles to an activity
- Assign rates on roles
Assigning Resources and Costs
- Assign resources by role
- Assign labor, non-labor, and material resources to activities
- Adjust Budgeted Units/Time for a resource
- Assign expenses to activities
Analyzing Resources
- Display the Resource Usage Profile
- Format a profile
- Format the timescale
Optimizing the Project Plan
- Analyze schedule dates
- Shorten a project schedule
- Analyze resource availability
- Remove resource over allocation
- Analyze project costs
Baselining the Project Plan
- Create a baseline plan
- Display baseline bars on the Gantt Chart
- Modify the bars on the Gantt Chart
Project Execution and Control
- Describe several methods for updating the project schedule
- Use Progress Spotlight
- Status activities
- Reschedule the project
Reporting Performance
- Describe reporting methods
- Run a schedule report
- Create a resource report with the Report wizard
- Create a report using the current layout
الموقع
نبذة عن معهد Vedant Trainings
We provide various consultation & training services for public & corporate in UAE in areas of Project Management, Quality, Excellence, Lean, Sales & Marketing, Safety, Risk Management , IT and related areas which helps the corporate & individuals to move towards excellence and aim for higher profits.
We are a three year old company and our services are provided to all of the major companies and public of its niche. We are considered as the best by our clients and it would be an honour to provide our services to you.
عرض الجميع دورات Vedant Trainings- 19 درهم
37 درهممدة الدورة التدريبية: 29 Hours - 19 درهم
71 درهممدة الدورة التدريبية: Upto 7 Hours